D-GÜSTROW
D-GÜSTROW
RECONSTRUCTION OF SEWERAGE NETWORK USING VITRIFIED CLAY SOCKET PIPES
DN 400 (115 m),
DN 300 (270 m) and
DN 350 (120 m)
HR-VARAZDIN
HR-VARAZDIN
NEW DEVELOPMENT OF SEWERAGE NETWORK IN AN INDUSTRIAL AREA
DN 400 (200 m)
B-EVERGEM
B-EVERGEM
RECONSTRUCTION OF CANALISATION AS A SEPARATE SEWERAGE NETWORK
DN 400 (2 x 2.100 m)
 
 
CH-ZÜRICH
ZURICH-SWITZERLAND
RECONSTRUCTION OF THE ZURICH WESTERN BYPASS CANALISATION
DN 150 – DN 800 (around 6 km)
D-HEIDELBERG
D-HEIDELBERG
NEW DEVELOPMENT OF THE SEWERAGE DISPOSAL SYSTEM
DN 300 – DN 500 (780 m)
D-MÜNCHEN
MUNICH
TUNNELLING UNDER THE MIDDLE RING SOUTH WEST
a. Carriageway drainage and combined wastewater deflection
DN 200 - DN 700 (around 3.5 Km)

b. Carriageway drainage
DN200 - DN 500 (around 6 Km)
 
 
Referenezen_Frankfurt
D-Frankfurt
41 hectare with 15,618m of clay pipes
DN 150 (3,000m), DN 250 (10m), DN 300 (7,900m), DN 400 (1060m), DN 500 (755m), DN 600 (750m)
Referenzen_Hochheim
D-Hochheim
Low inclination - no problem
DN 800 (250m), DN 700 (70m), DN 600 (100m)
Connecting the clay pipes to the domestic sewer system (DN 150 + DN 200)
Referenzen_Wuppertal
D-Wuppertal
In the monorail's shade
Installing 520m of new clay pipes (DN 600 - length: 2.5m)
 
 
Referenzen_Mailand
IT-Milan
2 projects - 1 pipe material
DN 200 (1,500m), DN 350 (8,860m), DN 400 (240m), DN 500 (500m)